Home | Sitemap | A-Z | FAQs | Contact
The project starts at R.P. 8.740 and ends at R.P. 9.440, a length of 700m. Proposed works involve removal and replacement of the severely deformed existing pavement, including reinforcement with geogrid. An existing 900mm diameter culvert is also to be replaced.
This project starts approximately 60m East of East Street (where is to tie in to a future project) and ends at Norrie Avenue opposite the BP Petrol Station.
Piako Road is a sealed rural arterial road connecting State Highway 1B in Gordonton to State Highway 26 in Matamata-Piako District to the east. The project starts at RP 0.886 and ends at RP 2.580, a length of 1694m. This project involves overlay of the existing pavement with associated shoulder widening and safety improvements to the Puketaha Road intersection.
Te Puroa Road is a rural road situated off Waingaro Road in the Whangape Ward of the Waikato District. The project starts at R.P. 2.72 and ends at R.P. 4.01, a distance of 1280m.
Waipa Heights Road is an unsealed rural road situated off Te Puroa Road in the Whangape Ward of the Waikato District. The project starts at R.P. 0.05 and ends at R.P.1.05, a distance of 1000m.
Coalfields Road is a sealed rural road in the Whangamarino Ward, east of Meremere, extending between State Highway 2 and Island Block Road. The project length is from RP 6.73 to RP 9.09, a distance of 2.36km.